362
1.
the
Intercepting
Math
Sewers. The bracing-
attached. shows
which the sewers of the
Central District of the town have been joined together under the
new Embank.
ment with the object of reducing
A minim
to
this outlet openings along
the newly built wall.
This
less mussary on sanitary grounds
than in
order to increase the strength = of the structure which should present as few perforations as possible of typhoon practicabler
tead
were
Curve of
of
the
The largest radic adopted for the
ww sewers
interception and as
points of interception
of them have been built on
of construction are bracing. The best
the old sea wall,
set forth
of the
44
The
graints of
where the stove
found completity sound, to make close joints and
Wa
ka
wad
pedressed.
utilized
in the sewer work, the blocks being
hydraulic lime mortar
laid in
on.
foundation of hydraulic home concrete,
the
masonry being pointed in Portland
filling
the trenches left
Cement.
In
by the removal of the old sewers due
precaution earth in thin layers
was taken to
Lown the
pan
so no to precont
subsequent subsidence. In the whole
length of wall newly reconstructed
large
mullah or
main drain ( Outlet No.4) designed
and
at the
mosh
there is but
Azue...
gradient
of about 1 in 2.0,
the flow of
The
sewage
to
accommodate Storm waters
Car
per
become sluggish
bridled at the curves.
obs.
although it was
The details
of
deviating from.
important sanitary rule to lead
At
house.
No comments yet.
Private notes are available after approval.